On-site trade clashes represent one of the single largest sources of cost overruns and schedule delays in commercial construction. Fidentec AEC brings multidisciplinary design and trade subcontractor models into a unified coordination environment using Navisworks Manage, Autodesk Construction Cloud (ACC), and BIM 360.
We lead virtual design and construction (VDC) coordination cycles, running automated clash detection matrices, producing constructability RFI reports, and rerouting MEP utilities and structural clearances in the model before concrete is cast or steel is erected.
BIM Coordination Execution
FEDERATED INTEGRATION
Multitrade Model Federation
- Alignment of architectural models, structural steel, and rebar cages
- Integration of HVAC ductwork, hydronic piping, and equipment layouts
- Plumbing sanitary, vent, and storm drain sloped pipe integration
- Electrical conduits, cable trays, and fire sprinkler main coordination
CLASH DETECTION
Hard & Soft Clash Reporting
- Automated Navisworks hard clash checks (e.g. duct through steel beam)
- Soft clearance checks (maintenance access, valve clearances, insulation)
- Filtered clash matrices eliminating false positives and minor overlaps
- Actionable PDF and BCF clash reports assigned by trade responsibility
CONSTRUCTABILITY
Sign-Off & Shop Release
- Weekly VDC coordination meetings with trade detailers and project leads
- Pre-pour penetrations and cast-in-place sleeve sign-off drawings
- 4D construction schedule sequencing simulations in Navisworks TimeLiner
- Sign-off milestone validation enabling immediate fabrication release